Home
|
Barry's Bio
|
Services
|
Standards
|
Recent Projects
|
Portfolio
|
References
|
Contact Us
-
Re-Square And Level At The Onset Of Each Job
-
Plumb All Walls Point To Point With "Plumb-It" Level
-
String All Walls For Complete Accuracy
-
Hand Pick Each Stud For Straightness
-
Hand Pick All Wall Plates For Straightest Material
-
Glue And Screw All Sub-Flooring
-
Hand Drive All Toe-Nailed Framing Members
-
Glue Between I-Joist And Hangers To Prevent Squeaking
-
String All Hips,Valleys And Ridges
-
Shim All Windows For Proper Alignment
-
Shim All Doors For Proper Alignment / Install Hinge Screws
-
Silicone And Tape All Windows / Doors To Manufacturers Instructions
-
Align All Framing Members From Basement To Roof
Standards ::
Images cannot be saved and are protected by copyright.
© 2009-2012 "All Rights Reserved"